Our History

Our History:

The Roosevelt Lake Ranch Water System is located in the unincorporated town and community of Lincoln, in  Lincoln County, Washington. We are located on the South shore of Lake Roosevelt approximately 37 miles upstream from the Grand Coulee Dam.  


We have two wells that service our community. One well at the depth of 281 feet, which pumps approximately 630 gallons per minute. The second well is at a depth of 319 feet, which pumps approximately 550 gallons per minute. We have been designated as a well field and our well source number is S03. 


The older parts of our system were installed by Crown Zellerbach Inc., in conjunction with their sawmill operation.  The system was purchased, expanded and operated by Lake Ranch Associates from 1984 - 1992. In 1992 the Roosevelt Lake Ranch Water System, a non-profit entity, was created. The members of the Board of Directors were elected in 1993 and all of the water system records were transferred to the non-profit on July 1, 1993. The Directors of the Corporation are domestic water users of the system.  In January of 1994 the Washington Department of Health reclassified the system from a Group B system to a Group A system. 


Our water system is currently approved for 421 water hook-ups. 

Billing & Water Rates

BILLING:

The Roosevelt Lake Ranch Water System billing is sent out every other month.

For billing questions please contact our bookkeeper:

Lori Derrer

509-339-8336

rlrws.billing@gmail.com



Mail Payments to:

RLRWS

PO Box 323

Wilbur, WA. 99185


Current Water Rates effective June 1, 2023

Full-Time Water Users Based on Bi-Monthly Billing:

  • $110.00 Base Rate for 2 months, up to 120,000 gallons.
  • $10.00 Capital Improvement Fund for two months.
  • $120.00 = Minimum payment for two months.

Additional Usage Rates:

  • 120,001 - 200,000 gallons at $0.70 per 1,000 gallons.
  • 200,001 - 300,000 gallons at $1.20 per 1,000 gallons.
  • 300,001 - 400,000 gallons at $1.70 per 1,000 gallons.
  • 400,001 gallons & above at $2.40 per 1,000 gallons.

Non-Water User Rates:

  • $54.00 Base Rate for two months.
  • $10.00 Capital Improvement Fund for two months.
  • $64.00 = Total payment for two months.

Disconnection Fee:

  • $100.00

Reconnection Fee:

  • $100.00

Late Fee:

  • $25.00 if the current billing cycle is not paid within 30 days. 

Delinquent Account Fees:

          * IF AN ACCOUNT IS PAST DUE FOR MORE THAN 90 DAYS

            RLRWS WILL BEGIN THE LIEN FILING PROCESS

            IF A LIEN IS FILED ON YOUR PROPERTY IT WILL INCUR 

            ADDITIONAL FEES IN EXCESS OF $1,000

Water System Joining Fees effective June 1, 2023


When purchasing a property from a Private Owner within the Development:

  • $250.00 Water District administrative fee paid for by the buyer, due at closing. 

Additional Fees effective June 1, 2023


CONTRACTOR WATER SALES

  • $10.00 per 1,000 gallons  - Bulk water pumped from system fees.


Accounts that remain unpaid for 90 days will be assessed the following fees:


LIEN FILING ASSESSMENT FEES - If a lien is filed for unpaid Water Fees, the following will apply:

  • $100.00 - RLRWS Lien Filing Fee
  • $100.00 - RLRWS Lien Release Fee
  • $100.00 - RLRWS Disconnection Fee
  • $100.00 - RLRWS Reconnection Fee

In addition you will be charged the current Lincoln County Lien Filing Fees:

  • $304.50 - Lincoln County Lien Recording Fee + $1.00 per page
  • $304.50 - Lincoln County Lien Release Fee + $1.00 per page


A LIEN WILL NOT BE RELEASED UNTIL ALL FEES ARE PAID IN FULL

Damage Fees To RLRWS Property

Please see below for Damage Fees as of January 1, 2024.

Download PDF

Notifications

REMINDER TO OUR CUSTOMERS:

Any leaks occurring beyond the curb stop valve are the sole responsibility of the lot owner.

Moratorium on Subdivisions & Annexations Remains in Place

2025 Annual Meeting Date: August Meeting Date TBD

The 2025 Annual Member Meeting will be held in August at the Lincoln Fire Station.  Date TBD

Monthly Board of Directors Meetings:

Our monthly Board of Directors meetings are held on the 2nd Wednesday of each month, 4:00PM at the Fire Station.  Date and time subject to change.

Water Hook-up Instructions

Step 1

Step 1

Step 1

Contact our Water System President at: (509) 339-8336 ext. 1


rlrws.president@gmail.com

Step 2

Step 1

Step 1

The Roosevelt Lake Ranch Water System requires all members to have a double - check valve and radio meter installed by a Washington State Licensed, Bonded & Insured Contractor.  

Step 3

Step 1

Step 3

Purchase a Radio Read Water Meter:


  • Required to be purchased from the Water System at RLRWS cost.  Meters are now in stock.
  • The current pricing is approximately $440.00.

Step 4

System Requirements

Step 3

Double Check Valve Options:

  • Wilkins 350 or
  • Wilkins 950 XLT

System Requirements

System Requirements

System Requirements

  • Only 1" IPS Poly is allowed. 
  • No PVC Pipe is allowed from the curb stop valve to the meter.

Enjoy!

System Requirements

System Requirements

Enjoy some of the highest quality water available. 

Roosevelt Lake Ranch Water System: The Details

The Details:

The Department of Ecology has approved our system for 839 annual acre feet of water per year.  Our groundwater certificate number is G3-24659C and is current through June 1st, 2022. 

Our water is treated with chlorine at the rate of one part per million, in accordance with Health Department directives.  The reason for this treatment is to control any possible bacteria in the water system.  Chlorine is the only additive in our system. 

  • Please note that if your water has not been in use for extended periods of time, be sure to let it run for a few minutes to remove water that has been stagnant in your line. 

The Health Department has rated our well with low susceptibility to contamination due to the depth of our wells, as well as the fact that our water quality results to date, indicate no impacts from surface activities. 


We have two holding tanks for a total of 205,350 gallons of equalizing storage, additive standby storage and fire protection storage.  The two reservoirs have individual volumes of 108,200 gallons and 138,900 gallons for a total of 247,100 gallons, leaving 41,750 gallons available for operating storage and dead storage above the overflow and below the distribution system intake pipe. Our system pumps water up to the reservoirs and then gravity feeds back to our customers. 


In 2016 we purchased a back-up generator to operate both of our pumps should we have an extended power outage.  The generator is a used 275KW Kohler Diesel Generator with a 400 gallon diesel tank, 3 phase, 60hz, 1800 rpm with 735 hours on it. 

For additional information concerning:

Compliance, Operating Permits, Operators, Water Use Efficiency, Source Information, Samples, and Water Quality Monitoring Schedule go to:

https://fortress.wa.gov/doh/eh/portal/odw/si/Intro.aspx and enter our ID # 47283E


Washington State Department of Health Office of Drinking Water:

http://www.doh.wa.gov/communityandenvironment/drinkingwater


Find out more

Do Your Part In Conserving Water

Download PDF

Our Board of Directors

Dustin Penwell - President

Delaine Britton - Secretary/VP

Delaine Britton - Secretary/VP

Email Address:

 rlrws.president@gmail.com 

Delaine Britton - Secretary/VP

Delaine Britton - Secretary/VP

Delaine Britton - Secretary/VP

Email Address:

 rlrws.secretary@gmail.com 

Clint King-Elmes - Treasurer

Delaine Britton - Secretary/VP

Eileen Scheibner - Member at large

Email Address:

 rlrws.treasurer@gmail.com

Eileen Scheibner - Member at large

Eileen Scheibner - Member at large

Eileen Scheibner - Member at large

Email Address:

rlrws.bod1@gmail.com

 

Cheryl Leipham - Member at Large

Eileen Scheibner - Member at large

Cheryl Leipham - Member at Large

Email Address:

rlrws.bod2@gmail.com

 

Consumer Confidence Reports

RLRWS Consumer Confidence Report 2022 (pdf)

Download

2022 RLRWS Water Use Efficiency Report-WFI (pdf)

Download

2023 Consumer Confidence Report (pdf)

Download

Water Use Efficiency Report 2023 (pdf)

Download

Water System Bylaws

First Amendment To Water Easement (pdf)

Download

Water System Amended Bylaws 2014 (pdf)

Download

Water System Bylaws (pdf)

Download

Annual Meeting Proxy Designation Form

2024 Proxy Voter Form (pdf)

Download

Contact Us

Drop us a line!

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Better yet, see us in person!

Please feel free to attend any of our monthly BOD meetings held at the Lincoln Fire Station 4PM on the 2nd Wednesday of each month.

Roosevelt Lake Ranch Water System

Roosevelt Lake Ranch Water System PO Box 323, Wilbur, WA 99185

rlrws.president@gmail.com or call 509-339-8336 ext.1

RLRWS BOD Meeting Minutes 2025

Files coming soon.

RLRWS BOD Meeting Minutes 2024

RLRWS BOD January 2024 Minutes (pdf)Download
RLRWS BOD February 2024 Minutes (pdf)Download
RLRWS BOD March 2024 Minutes (pdf)Download
RLRWS BOD April 2024 Minutes (pdf)Download
RLRWS BOD May 2024 Minutes (pdf)Download
RLRWS BOD June 2024 Minutes (pdf)Download
RLRWS BOD July 2024 Minutes (pdf)Download
RLRWS BOD August 2024 Minutes (pdf)Download
RLRWS BOD September 2024 Minutes (pdf)Download
RLRWS BOD October 2024 Minutes (pdf)Download
RLRWS BOD November 2024 Minutes (pdf)Download
RLRWS BOD December 2024 Minutes (pdf)Download

Water System Meeting Minutes 2023

RLRWS BOD January 2023 Minutes (pdf)Download
RLRWS BOD February 2023 Minutes (pdf)Download
RLRWS BOD March 2023 Minutes (pdf)Download
RLRWS BOD April 2023 Minutes (pdf)Download
RLRWS BOD May 2023 Minutes (pdf)Download
RLRWS BOD June 2023 Minutes (pdf)Download
RLRWS BOD July 2023 Minutes (pdf)Download
RLRWS BOD August 2023 Minutes (pdf)Download
RLRWS BOD September 2023 Minutes (pdf)Download
RLRWS BOD October 2023 Minutes (pdf)Download
RLRWS BOD November 2023 Minutes (pdf)Download
RLRWS BOD December 2023 Meeting Minutes (pdf)Download

Water System Meeting Minutes 2022

RLRWS BOD January 2022 Minutes (pdf)Download
RLRWS BOD February 2022 minutes (pdf)Download
RLRWS BOD March 2022 minutes (pdf)Download
RLRWS BOD April 2022 minutes (pdf)Download
RLRWS BOD May 2022 minutes (pdf)Download
RLRWS BOD June 2022 minutes (pdf)Download
RLRWS BOD July 2022 Minutes (pdf)Download
RLRWS BOD August 2022 Minutes (pdf)Download
RLRWS BOD September 2022 Minutes (pdf)Download
RLRWS BOD October 2022 Minutes (pdf)Download
RLRWS BOD November 2022 Minutes (pdf)Download
RLRWS BOD December 2022 Minutes (pdf)Download

Copyright © 2025 Roosevelt Lake Ranch Water System - All Rights Reserved.

Powered by GoDaddy